Popular searches

Didn't find it? Write to us

BIM Implementation

If you need to resolve clashes, optimize workflows, improve coordination among project staff and departments, shorten design documentation timelines, track changes at every project stage, reduce errors throughout the project life cycle, and lower overall project costs, we offer an integrated approach to design and construction based on building information modeling (BIM).

Service price

Service option
Basic500 000 ₸

Scope of work and stages

Why use BIM?

To meet evolving business needs, comply with legal requirements, maintain and strengthen your market position, and secure new projects, organizations need to keep improving and adopt modern technologies and tools.

Read more

If you need to:

  • resolve clashes,
  • optimize workflows and improve coordination among all employees and departments involved in a project
  • reduce the time needed to prepare design documentation
  • track changes at every project stage
  • reduce errors throughout the project life cycle
  • lower the overall project cost

we offer an integrated approach to design and construction based on building information modeling (BIM).

Using an integrated BIM-based design solution enables you to:

  • complete all required tasks within your organization
  • monitor the project at any stage
  • significantly reduce delivery time and costs

Without a shared information model, collaboration becomes considerably more difficult.

BIM technology—building information modeling—simplifies collaboration and helps teams identify and resolve clashes at every stage of design.

Implementation includes completing a pilot project using BIM technology and tools. An existing project developed with traditional methods can serve as the basis for the pilot; for a more complex implementation, a new project can be used. Implementation includes at least the following stages:

  • installing and configuring software (Revit, Revit Server);
  • developing and approving a BIM standard;
  • assigning roles and responsibilities to participants;
  • providing timely guidance as participants perform tasks, resolving issues, modeling, producing working documentation, and identifying and analyzing clashes;
  • updating the BIM standard.

Implementation costs depend on the scope and complexity of the pilot project and the number of participants. Implementation costs exclude software and any travel expenses (if the work is outside Astana). The minimum price is based on the preliminary and architectural design sections (Э, ЭП, АР, АС). The structural sections (КЖ, КМ) are priced separately.

Choose a package

Other services

Other options for the same task.